Alongside turbines
Steam recovery or process steam packages that sit with a Bluebox hot air turbine so power and thermal duties stay aligned.
Home · Products · Steam systems
Products
Where a site needs steam as well as — or instead of — a hot air turbine, Bluebox designs and integrates the steam side of the plant.
In this example, the Bluebox-80 directly feeds the steam generator minimising thermal losses and back pressure. Steam can then be circulated to the next process.
The bottom skid automatically treats the condensates coming out of the process, topping up water level and adjusting PH level. The treated water is then sent back to the Steam generator.
Steam recovery or process steam packages that sit with a Bluebox hot air turbine so power and thermal duties stay aligned.
Steam plant specification, supplier selection and integration when the right answer is a conventional steam route.
Off-design and transient modelling so the steam circuit matches real furnace and ambient conditions — not brochure points.
CAD, controls, project management and commissioning available as consulting or as part of a full supply package.